Labour Statement

State: Odisha District: Ganjam Block: Bhanjanagar Gram Panchayat: Dihapadhal
Work Code: OD/354/3367/117640/410600/00058424 (Completion of Incomplete AWC building at Betar)
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Bhanjanagar Bill Status: Final Bill
Proposal Date: - Date of Commencement: 16-10-2025
Date of Completion: 28-10-2025 Scheme Name: Asset Management Women and Child Development Department
Scheme Component Name: Self/Personal Deposit Project Sub-Category: AWC
Project Type: Completion Name of Executant: RABINDRANATH NAIK
Administrative Approval Details
Approval No.: OD/354/3367/117640/410600/00058424/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3367/117640/410600/00058424/TS
Fund Sanction No.: 7195
Fund Sanction Amount (in Rs.): 100000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Highly-Skilled
Rs. 462 Rs. 562 Rs. 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Other Building Items. (AR1902) : cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 321.4811 Square Meter 0.057 18.3244227 0.05 16.074055 - -
2 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 190.211 Square Meter 0.053763440860215 10.226397849462 - - 0.053763440860215 10.226397849462
3 Painting (AR0901ci) : Priming one coat with outer surface primer of approved quality oil-bound primer over plastering surfaces(Outer surface) - Priming one coat with outer surface primer of approved quality oil-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 91.776 Square Meter 0.053763440860215 4.9341935483871 - - 0.053763440860215 4.9341935483871
4 Painting (AR0922) : Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 190.211 Square Meter 0.062 11.793082 - - 0.052 9.890972
5 Painting (AR0918ca) : Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 91.776 Square Meter 0.11776344086022 10.807857548387 - - 0.10776344086022 9.8900975483871
Total Qty 56.085953646237 16.074055 34.941660946237
Rate Per Man Day 462 562 612
Total Amount 25911.710584561 9033.61891 21384.296499097
Total Labour Amount (in Rs.): 56329.625993658