Labour Statement

State: Odisha District: Khordha Block: Khordha Gram Panchayat: Bajapur
Work Code: OD/362/3464/119663/407431/00060475 (Construction of Grade II Metal road from Dihapur Sukuta Ranasingh house to Nuapokhari)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Khordha Bill Status: Final Bill
Proposal Date: - Date of Commencement: 25-10-2025
Date of Completion: 19-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: All Weather Connectivity Project Sub-Category: Mettalling Road
Project Type: New Work Name of Executant: BHASKAR CHANDRA RATH
Administrative Approval Details
Approval No.: OD/362/3464/119663/407431/00060475/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3464/119663/407431/00060475/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 300000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Road Work (AR1306) : Labour for admixture of sand and moorum - Labour for admixture of sand and moorum including labour cost, for work as per specification and direction of Engineer-in-Charge. 84.9504 Cubic Meter 0.25 21.2376 - - - -
2 Road Work (AR1308) : moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 84.9504 Cubic Meter 1.1333922261484 96.282122968198 - - - -
3 Road Work (AR1313) : Supplying & spreading with sand 6mm thick for road binding in road surface - Supplying & spreading with sand 6mm thick for road binding in road surface including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and direction of Engineer-in-Charge. 557.418 Square Meter 0.0032258064516129 1.7981225806452 - - - -
4 Road Work (AR1341d) : Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam - Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). 56.067264 Cubic Meter 0.69444444444444 38.9356 0.028 1.569883392 0.0055555555555556 0.3114848
5 Earth Work (AR0110) : Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. 557.418 Square Meter 0.01 5.57418 - - - -
Total Qty 163.82762554884 0.3114848 1.569883392
Rate Per Man Day 462 562 512
Total Amount 75688.363003565 175.0544576 803.780296704
Total Labour Amount (in Rs.): 76667.197757869