Labour Statement

State: Odisha District: Jagatsinghpur Block: Erasama Gram Panchayat: Nuadihi
Work Code: OD/355/3388/118109/397331/00062267 (Repair and maintenance of PHC building at Mallipur)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Erasama Bill Status: 1st Bill
Proposal Date: - Date of Commencement: 20-11-2025
Date of Completion: - Scheme Name: Asset Management Health and Family Welfare Department
Scheme Component Name: Self/Personal Deposit Project Sub-Category: Primary Health Centre
Project Type: Repair and Maintenance Name of Executant: Susanta Kumar Nanda
Administrative Approval Details
Approval No.: OD/355/3388/118109/397331/00062267/AS
Technical Sanction Details
Technical Sanction No.: OD/355/3388/118109/397331/00062267/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 155000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Highly-Skilled Un-Skilled Skilled
Rs. 612 Rs. 462 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Painting (AR0903b) : Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. 28.6605755 Square Meter 0.17204301075269 4.9308516989247 - - 0.18817204301075 5.3931190456989
2 Other Building Items. (AR1902) : cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 155.0960121909 Square Meter 0.057 8.8404726948813 0.05 7.754800609545 - -
3 Painting (AR0918cb) : Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 140.47212309 Square Meter 0.11776344086022 16.542480560018 - - 0.10776344086022 15.137759329118
4 Painting (AR0921b) : Finishing wall One Coat with distemper of approved shades with one coat water bound Primer on old work (Inside) - Finishing wall surface with One Coat with distemper of approved shades above one coat waterbound Primer on old work to give an even shade including all costs of labor, Paint, Primer, Brushes and putty required for the work, etc. complete and as per direction of the Engineer-in-charge..(Inside) 376.6021081293 Square Meter 0.093763440860215 35.311509493414 - - 0.086763440860215 32.675294736509
Total Qty 53.206173111326 65.625314447238 7.754800609545
Rate Per Man Day 612 462 562
Total Amount 32562.177944131 30318.895274624 4358.1979425643
Total Labour Amount (in Rs.): 67239.27116132