Labour Statement

State: Odisha District: Balangir Block: Turekela Gram Panchayat: Buromal
Work Code: OD/345/3297/116027/421208/00063610 (MAINTEANANCE OF ROAD FROM KUKUDAHAD JHANKARPADA TO PWD ROAD)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Turekela Bill Status: Final Bill
Proposal Date: - Date of Commencement: 06-11-2025
Date of Completion: 15-11-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: Repair and Maintenance Name of Executant: TEJU PUTEL
Administrative Approval Details
Approval No.: OD/345/3297/116027/421208/00063610/AS
Technical Sanction Details
Technical Sanction No.: OD/345/3297/116027/421208/00063610/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 500000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0122Ai) : Earth work in all kinds of soil within 50m, initial lead and 1.5m, initial lift - Earth work in all kinds of soil within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 5.88706272 Cubic Meter 0.473534 2.7877243580525 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 33.15330944 Cubic Meter 0.1236 4.097749046784 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 53.37433632 Cubic Meter 3.9 208.159911648 - - 0.18 9.6073805376
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 28.50227504 Cubic Meter 4.6 131.110465184 - - 0.68 19.3815470272
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 55.184382 Square Meter - - 0.05 2.7592191 0.05 2.7592191
Total Qty 346.15585023684 31.7481466648 2.7592191
Rate Per Man Day 462 562 512
Total Amount 159924.00280942 17842.458425618 1412.7201792
Total Labour Amount (in Rs.): 179179.18141424