Labour Statement

State: Odisha District: Balangir Block: Muribahal Gram Panchayat: Gudighat
Work Code: OD/345/3292/115923/421111/00063626 (Const of Vana Suraksha Samiti Building at Babejuri)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Muribahal Bill Status: 1st Bill
Proposal Date: - Date of Commencement: 18-11-2025
Date of Completion: - Scheme Name: Construction of Vana Suraksha Samiti Building
Scheme Component Name: Construction of Buildings for Vana Suraksha Samiti Project Sub-Category: Vana Suraksha Samiti Building
Project Type: New Work Name of Executant: DEBANANDA MEHER
Administrative Approval Details
Approval No.: OD/345/3292/115923/421111/00063626/AS
Technical Sanction Details
Technical Sanction No.: OD/345/3292/115923/421111/00063626/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 850000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled Highly-Skilled
Rs. 462 Rs. 562 Rs. 512 Rs. 612
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 22.60384675 Cubic Meter 0.1236 2.7938354583 - - - - - -
2 Earth Work (AR0122Ai) : Earth work in all kinds of soil within 50m, initial lead and 1.5m, initial lift - Earth work in all kinds of soil within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 32.28853125 Cubic Meter 0.473534 15.289717356937 - - - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 9.2000972325 Cubic Meter 3.9 35.88037920675 - - 0.18 1.65601750185 - -
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 25.38983012 Square Meter - - 0.05 1.269491506 0.05 1.269491506 - -
5 R.C.C. Work (AR0410d) : Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 45.56745 Square Meter - - 0.6547619047619 29.835830357143 0.6547619047619 29.835830357143 - -
6 R.C.C. Work (AR0410e) : Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. Lintels Data for 7.8 sqm 9.250982 Square Meter - - 0.16025641025641 1.4825291666667 0.16025641025641 1.4825291666667 - -
7 R.C.C. Work (AR0409) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 9.791968 Quintal 0.8 7.8335744 0.044 0.430846592 - - 0.3 2.9375904
8 R.C.C. Work (AR0404A) : Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 11.932512465 Cubic Meter 1.3333 15.909618869584 0.0573 0.6837329642445 0.1 1.1932512465 - -
9 Masonry Brick Work (AR0603b) : Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 19.99416225 Cubic Meter 2.96 59.18272026 - - 1.05 20.9938703625 0.35 6.9979567875
10 Masonry Stone Work (AR0717) : Laterite stone masonry - Laterite stone masonry in cement mortar (1:6) in foundation and plinth cost conveyance, royalty, taxes of all materials, labor, required for the work, etc. complete and as per direction of the Engineer-in-charge. 14.43845907 Cubic Meter 1.21 17.4705354747 1.41 20.3582272887 1.05 15.1603820235 2.295 33.13626356565
Total Qty 154.36038102627 71.59137216416 54.060657874754 43.07181075315
Rate Per Man Day 462 562 512 612
Total Amount 71314.496034138 40234.351156258 27679.056831874 26359.948180928
Total Labour Amount (in Rs.): 165587.8522032