Labour Statement

State: Odisha District: Sundargarh Block: Koida Gram Panchayat: Jamudihi
Work Code: OD/373/3579/121614/384720/00066303 (Construction of CC Road from RD Road to Kudamusa Singh House)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Koida Bill Status: 1st Bill
Proposal Date: 25-09-2025 Date of Commencement: 15-12-2025
Date of Completion: - Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: CC Road
Project Type: New Work Name of Executant: SANJAY KUMAR NAYAK
Administrative Approval Details
Approval No.: OD/373/3579/121614/384720/00066303/AS
Technical Sanction Details
Technical Sanction No.: OD/373/3579/121614/384720/00066303/TS
Fund Sanction No.: 06/2025/26
Fund Sanction Amount (in Rs.): 338428
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled
Rs. 462 Rs. 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 4.32 Cubic Meter 0.516 2.22912 - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 19.73 Cubic Meter 0.1236 2.438628 - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 28.05 Cubic Meter 3.9 109.395 0.18 5.049
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 22.65 Cubic Meter 4.6 104.19 0.68 15.402
Total Qty 218.252748 20.451
Rate Per Man Day 462 562
Total Amount 100832.769576 11493.462
Total Labour Amount (in Rs.): 112326.231576