Labour Statement

State: Odisha District: Koraput Block: Jeypore Gram Panchayat: Balia
Work Code: OD/363/3470/119780/429083/00066718 (CONST OF PAVER BLOCK / CC ROAD FROM HARIJAN SAHI TO MALISAHI PALIGUDA)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Jeypore Bill Status: Final Bill
Proposal Date: - Date of Commencement: 04-12-2025
Date of Completion: 04-12-2025 Scheme Name: Bikashita Gaon Bikashita Odisha
Scheme Component Name: Viksit Gaon Vikshit Odisha (VGVO) Project Sub-Category: Pavor Block
Project Type: New Work Name of Executant: BHABANI SANKAR PATRA
Administrative Approval Details
Approval No.: OD/363/3470/119780/429083/00066718/AS
Technical Sanction Details
Technical Sanction No.: OD/363/3470/119780/429083/00066718/TS
Fund Sanction No.: 2312345634
Fund Sanction Amount (in Rs.): 300000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
Rs. 462 Rs. 562 Rs. 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 46.575 Cubic Meter 0.1236 5.75667 - - - -
2 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 18.225 Cubic Meter 3.9 71.0775 - - 0.18 3.2805
3 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 16.2 Cubic Meter 0.516 8.3592 - - - -
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 60.75 Square Meter - - 0.05 3.0375 0.05 3.0375
Total Qty 85.19337 6.318 3.0375
Rate Per Man Day 462 562 512
Total Amount 39359.33694 3550.716 1555.2
Total Labour Amount (in Rs.): 44465.25294