Material Statement

State: Odisha District: Ganjam Block: Chikiti Gram Panchayat: Katuru
Work Code: OD/354/3370/117697/412720/00038833 (Repair & Maintenance of Multipurpose cyclone shelter at Aladipur)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Chikiti Bill Status: 1st Bill
Proposal Date: 01-02-2025 Date of Commencement: 19-09-2025
Date of Completion: - Scheme Name: Infrastructure Development Fund
Scheme Component Name: Self/Personal Deposit Project Sub-Category: Cyclone Centre
Project Type: Repair and Maintenance Name of Executant: NARAYAN BEHERUK
Administrative Approval Details
Approval No.: OD/354/3370/117697/412720/00038833/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3370/117697/412720/00038833/TS
Fund Sanction No.: 595
Fund Sanction Amount (in Rs.): 580000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM138 BRM140 BRM253 BRM255
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 167.8545 Sqm 0.043 7.2177435 0.018 3.021381 - - - - - - - -
2 Painting(AR0901a) :.Priming one coat in inner surface with primer of approved quality over woodwork - Priming one coat in inner surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 1028.812 Sqm - - - - 0.075 77.1609 - - - - - -
3 Painting(AR0919) :.Finishing wall One Coat with plastic emulsion paint of approved shades on old work (Inside) - Finishing wall One Coat with plastic emulsion paint of approved shades on old work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 1028.812 Sqm - - - - - - 0.075 77.1609 - - - -
4 Painting(AR0901di) :.Fourth Floor - Priming one coat with outer surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 354.465 Sqm - - - - - - - - 0.090322580645161 32.016193548387 - -
5 Painting(AR0918Ai) :.Finishing wall one coat with weather coat - Finishing wall one coat with weather coat including all costs of labour, Paint, Primer and Brushes required for the work etc. complete and as per direction of Engineer-in-charge. 354.465 Sqm - - - - - - - - - - 0.075 26.584875
Total Qty 7.2177435 3.021381 77.1609 77.1609 32.016193548387 26.584875
Rate Per Unit 619.175 628.68 155.58945 249.84945 159.53945 195.29945
Total Amount 4469.0463316125 1899.48180708 12005.421992505 19278.608426505 5107.8459098032 5192.0114658187
Total Material Amount (in Rs.): 47952.415933324