Material Statement

State: Odisha District: Nayagarh Block: Dasapalla Gram Panchayat: Similisahi
Work Code: OD/367/3524/120623/405563/00046415 (Improvement Of Road From Kuanria Canal To Bijayanagar)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Dasapalla Bill Status: Final Bill
Proposal Date: - Date of Commencement: 31-10-2025
Date of Completion: 22-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: Rasmi Ranjan Dash
Administrative Approval Details
Approval No.: OD/367/3524/120623/405563/00046415/AS
Technical Sanction Details
Technical Sanction No.: OD/367/3524/120623/405563/00046415/TS
Fund Sanction No.: 15217
Fund Sanction Amount (in Rs.): 350000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 29.2968 Cum 1 29.2968 - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 29.2968 Cum - - 2.29 67.089672 0.48 14.062464 0.96 28.124928 - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 23.411736 Cum - - 3.23 75.61990728 0.45 10.5352812 - - 0.9 21.0705624 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 27.6692 Sqm - - - - - - - - - - 0.00267 0.073876764 0.126 3.4863192
Total Qty 29.2968 142.70957928 24.5977452 28.124928 21.0705624 0.073876764 3.4863192
Rate Per Unit 332.58 593.572 469.21 1295.11 1737.73 58573.086 229.106
Total Amount 9743.529744 84708.410392388 11541.508025292 36424.87550208 36614.948399352 4327.1900511737 798.7366466352
Total Material Amount (in Rs.): 184159.19876092