Material Statement

State: Odisha District: Ganjam Block: Dharakote Gram Panchayat: Dhaugam
Work Code: OD/354/3371/117711/411352/00047580 (CC ROAD KOTHA GHARA SIDE BRIDGE TO BANDHA AT BAHADAGUDA)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Dharakote Bill Status: Final Bill
Proposal Date: 05-08-2024 Date of Commencement: 06-08-2025
Date of Completion: 12-08-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES Project Sub-Category: CC Road
Project Type: New Work Name of Executant: DRNATH
Administrative Approval Details
Approval No.: OD/354/3371/117711/411352/00047580/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3371/117711/411352/00047580/TS
Fund Sanction No.: 29781
Fund Sanction Amount (in Rs.): 164000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 7.775 Cum 1 7.775 - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 16.675 Cum - - 2.29 38.18575 0.48 8.004 0.96 16.008 - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 7.775 Cum - - 3.23 25.11325 0.45 3.49875 - - 0.9 6.9975
4 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 16.675 Cum - - - - - - - - - -
Total Qty 7.775 63.299 11.50275 16.008 6.9975
Rate Per Unit 403.97 593.232 407.34 1336.36 1737.73
Total Amount 3140.86675 37550.992368 4685.530185 21392.45088 12159.765675
Total Material Amount (in Rs.): 78929.605858