| State: Odisha |
District: Ganjam |
Block: Chatrapur |
Gram Panchayat: Laxmipur |
Work Code: OD/354/3369/117683/412144/00014582 (Repair and Maintenance AWC building at Govindapur-2)
Project Category: Building
| Financial Year: 2023-24 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Chatrapur |
Bill Status:
Final Bill
|
| Proposal Date: - |
Date of Commencement: 07-04-2025 |
| Date of Completion: 16-04-2025 |
Scheme Name: Asset Management Women and Child Development Department |
| Scheme Component Name: Self/Personal Deposit |
Project Sub-Category: AWC |
| Project Type: New Work |
Name of Executant: MANINI MUNI |
Administrative Approval Details
Approval No.: OD/354/3369/117683/412144/00014582/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3369/117683/412144/00014582/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 45000
ROYALTY STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM029 |
BRM340 |
BRM028 |
BRM045 |
BRM056 |
BRM255 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge |
0.847 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
0.42 |
Cum |
1 |
0.42 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
0.56 |
Cum |
- |
- |
2.29 |
1.2824 |
0.48 |
0.2688 |
0.96 |
0.5376 |
- |
- |
- |
- |
| 4 |
Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. |
0.42 |
Cum |
- |
- |
3.23 |
1.3566 |
0.45 |
0.189 |
- |
- |
0.9 |
0.378 |
- |
- |
| 5 |
Painting(AR0918fk) :.Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint and Brushes required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). |
195.94 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
0.125 |
24.4925 |
| Total Qty |
0.42 |
2.639 |
0.4578 |
0.5376 |
0.378 |
24.4925 |
| Rate Per Unit |
774.25 |
0 |
774.25 |
252.5 |
252.5 |
0 |
| Total Amount |
325.185 |
0 |
354.45165 |
135.744 |
95.445 |
0 |
Total Royalty Amount (in Rs.): 910.82565