Royalty Statement

State: Odisha District: Ganjam Block: Beguniapada Gram Panchayat: Beruanbadi
Work Code: OD/354/3365/117597/411727/00017545 (REPAIR AND MAINTANANCE OF AWC BUILDING AT BERUNBADI 2)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Beguniapada Bill Status: Final Bill
Proposal Date: 03-12-2024 Date of Commencement: 03-06-2025
Date of Completion: 05-07-2025 Scheme Name: Asset Management Women and Child Development Department
Scheme Component Name: Self/Personal Deposit Project Sub-Category: AWC
Project Type: Repair and Maintenance Name of Executant: DHARMENDRA BADTYA
Administrative Approval Details
Approval No.: OD/354/3365/117597/411727/00017545/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3365/117597/411727/00017545/TS
Fund Sanction No.: 11574
Fund Sanction Amount (in Rs.): 45000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM253 BRM138 BRM142 BRM255 BRM252
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 190.9175 Sqm 0.084 16.03707 - - - - - - - -
2 Painting(AR0901ai) :.Priming one coat in outer surface with primer of approved quality over woodwork - Priming one coat in outer surface with primer of approved quality over woodwork including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 91.085 Sqm - - 0.075 6.831375 - - - - - -
3 Painting(AR0922) :.Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 155.3775 Sqm - - - - 0.25 38.844375 - - - -
4 Painting(AR0918gk) :.Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work(Outside)(For repair and maintenance) . - Finishing wall with two coats weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge(Outside)(For repair and maintenance). 72.68 Sqm - - - - - - 0.125 9.085 0.084 6.10512
Total Qty 16.03707 6.831375 38.844375 9.085 6.10512
Rate Per Unit 0 0 0 0 0
Total Amount 0 0 0 0 0
Total Royalty Amount (in Rs.): 0