Royalty Statement

State: Odisha District: Nabarangpur Block: Chandahandi Gram Panchayat: Mohara
Work Code: OD/366/3513/120429/427463/00040748 (Const of CC Road at Pujariguda)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Chandahandi Bill Status: Final Bill
Proposal Date: 15-05-2025 Date of Commencement: 19-10-2025
Date of Completion: 14-11-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: CC Road
Project Type: New Work Name of Executant: KALISANKAR PATBANDHA
Administrative Approval Details
Approval No.: OD/366/3513/120429/427463/00040748/AS
Technical Sanction Details
Technical Sanction No.: OD/366/3513/120429/427463/00040748/TS
Fund Sanction No.: 15612
Fund Sanction Amount (in Rs.): 400000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 34.688 Cum 1 34.688 - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 34.688 Cum - - 2.29 79.43552 0.48 16.65024 0.96 33.30048 - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 27.7504 Cum - - 3.23 89.633792 0.45 12.48768 - - 0.9 24.97536
Total Qty 34.688 169.069312 29.13792 33.30048 24.97536
Rate Per Unit 40.25 0 40.25 149.5 149.5
Total Amount 1396.192 0 1172.80128 4978.42176 3733.81632
Total Royalty Amount (in Rs.): 11281.23136