Royalty Statement

State: Odisha District: Sonepur Block: Sonepur Gram Panchayat: Khari
Work Code: OD/372/3570/121480/419657/00043072 (COMPLETION OF COMMUNITY CENTER AT TAREIKELA UPAR PADA 5TH CFC UNTIED)
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Sonepur Bill Status: 1st Bill
Proposal Date: 05-02-2025 Date of Commencement: 16-08-2025
Date of Completion: - Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: Community Centre
Project Type: Completion Name of Executant: Saroj kumar Dora
Administrative Approval Details
Approval No.: OD/372/3570/121480/419657/00043072/AS
Technical Sanction Details
Technical Sanction No.: OD/372/3570/121480/419657/00043072/TS
Fund Sanction No.: 15612
Fund Sanction Amount (in Rs.): 201919
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM060 BRM052 BRM084 BRM104 BRM341
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0404Ag) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 4.600222 Cum 3.4733 15.9779510726 0.45 2.0700999 0.36 1.65607992 0.54 2.48411988 0.0919908 0.4231781019576 0.06026064 0.27721232186208 - -
2 R.C.C. Work (AR0404Ac) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 1.455 Cum 3.4733 5.0536515 0.45 0.65475 0.36 0.5238 0.54 0.7857 0.0544068 0.079161894 0.0498348 0.072509634 - -
3 R.C.C. Work (AR0409) :.First floor - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 5.7 Qntl - - - - - - - - - - - - 1.05 5.985
Total Qty 21.0316025726 2.7248499 2.17987992 3.26981988 0.5023399959576 0.34972195586208 5.985
Rate Per Unit 0 170.25 279.5 279.5 0 0 0
Total Amount 0 463.905695475 609.27643764 913.91465646 0 0 0
Total Royalty Amount (in Rs.): 1987.096789575