Royalty Statement

State: Odisha District: Gajapati Block: Mohona Gram Panchayat: Liliguda
Work Code: OD/353/3360/275039/413849/00052699 (IMPROVEMENT OF ROAD WITH CC / GRADE-2 MEATILING FROM RD RAIPADARA AT RAIPADARA)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Mohona Bill Status: Final Bill
Proposal Date: 16-02-2024 Date of Commencement: 23-09-2025
Date of Completion: 06-12-2025 Scheme Name: 5th SFC Grant in Aid
Scheme Component Name: Maintenance and improvement of Road infrastructure Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Sudipti Padhiari
Administrative Approval Details
Approval No.: OD/353/3360/275039/413849/00052699/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3360/275039/413849/00052699/TS
Fund Sanction No.: 3781
Fund Sanction Amount (in Rs.): 350000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 18.425 Cum 1 18.425 - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 25.025 Cum - - 2.29 57.30725 0.48 12.012 0.96 24.024 - - - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 66 Sqm - - - - - - - - 0.00267 0.17622 0.000614 0.040524 - -
4 Earth Work (AR0103a) :.Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift - Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department 43.45 Cum - - - - - - - - - - - - - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 15.05625 Cum - - 3.23 48.6316875 0.45 6.7753125 - - - - - - 0.9 13.550625
Total Qty 18.425 105.9389375 18.7873125 24.024 0.17622 0.040524 13.550625
Rate Per Unit 319.5 0 319.5 419 0 0 419
Total Amount 5886.7875 0 6002.54634375 10066.056 0 0 5677.711875
Total Royalty Amount (in Rs.): 27633.10171875