Royalty Statement

State: Odisha District: Gajapati Block: Gumma Gram Panchayat: Tumula
Work Code: OD/353/3358/117475/414314/00062250 (Improvement of road from Tumulo to Tumchar)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Gumma Bill Status: Final Bill
Proposal Date: - Date of Commencement: 17-11-2025
Date of Completion: 05-12-2025 Scheme Name: Kandhamal O Gajapati Bikas Yojana
Scheme Component Name: Self/Personal Deposit Project Sub-Category: CC Road
Project Type: Upgradation or Improvement Name of Executant: PRASANT KUMAR MISHRA
Administrative Approval Details
Approval No.: OD/353/3358/117475/414314/00062250/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3358/117475/414314/00062250/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 200000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM045 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0103a) :.Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift - Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department 3.68 Cum - - - - - - - - - - - -
2 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 18.28 Cum 2.29 41.8612 0.48 8.7744 0.96 17.5488 - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 10.22 Cum 3.23 33.0106 0.45 4.599 - - 0.9 9.198 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 8 Sqm - - - - - - - - 0.00267 0.02136 0.000614 0.004912
Total Qty 74.8718 13.3734 17.5488 9.198 0.02136 0.004912
Rate Per Unit 0 279.25 269.5 269.5 0 0
Total Amount 0 3734.52195 4729.4016 2478.861 0 0
Total Royalty Amount (in Rs.): 10942.78455