Royalty Statement

State: Odisha District: Jajpur Block: Bari Gram Panchayat: Bhanra
Work Code: OD/356/3395/118283/401914/00062992 (Repairing of CC road from Suchitra Jena house to Bikram Jena house)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Bari Bill Status: Final Bill
Proposal Date: - Date of Commencement: 01-11-2025
Date of Completion: 06-11-2025 Scheme Name: SFC Devolution of Fund
Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI Project Sub-Category: CC Road
Project Type: New Work Name of Executant: Rakesh Kumar Mallik
Administrative Approval Details
Approval No.: OD/356/3395/118283/401914/00062992/AS
Technical Sanction Details
Technical Sanction No.: OD/356/3395/118283/401914/00062992/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 200000
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056 BRM104 BRM092 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 24.040184488 Cum 3.23 77.64979589624 0.45 10.8180830196 0.9 21.6361660392 - - - - - -
2 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 3.92515175 Sqm - - - - - - 0.00267 0.0104801551725 0.000614 0.0024100431745 - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 0.79092220416 Cum 2.29 1.8112118475264 0.48 0.3796426579968 - - - - - - 0.96 0.7592853159936
Total Qty 79.461007743766 11.197725677597 21.6361660392 0.0104801551725 0.0024100431745 0.7592853159936
Rate Per Unit 0 274.25 444.5 0 0 444.5
Total Amount 0 3070.9762670809 9617.2758044244 0 0 337.50232295916
Total Royalty Amount (in Rs.): 13025.754394464