State: Odisha District: Angul Block: Chhendipada Gram Panchayat: Machhakuta
Work Code: OD/344/3279/115651/404461/00037426 (RENOVATION OF PANASAKATA POND AT PODAPADA)
Project Category: Water Body
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Chhendipada Proposal Date: -
Date of Commencement: 08-01-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Tank Project Type: Renovation or Rejuvenation
Name of Executant: RAJESH KUMAR SAHU
Administrative Approval Details
Approval No.: OD/344/3279/115651/404461/00037426/AS
Technical Sanction Details
Technical Sanction No.: OD/344/3279/115651/404461/00037426/TS
Fund Sanction No.: 33742
Fund Sanction Amount (in Rs.): 800000
ACTIVITY STATEMENT
Sl.No. Activity taken Unit Quantity Unit Price (in Rs.) Total (in Rs.)
1 Special items for irrigation works (AR0216) : Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum within an initial lead of 1km from the place of excavation. - Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation complete. Per 1 cum. Cum 11648 67.165 782337.92
Total Amount (in Rs.): 782337.92
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit
No data to display.
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRMMR0065 BRMMR0102 BRMMR0104
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Special items for irrigation works(AR0216) :.Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum within an initial lead of 1km from the place of excavation. - Excavation, loading, unloading, and carriage by mechanical means of all kinds of soil, including stoney earth, gravel, and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation complete. Per 1 cum. 11648 Cum 1 11648 1 11648 1 11648
Total Qty 11648 11648 11648
Rate Per Unit 1 25.01 40.49
Total Amount 11648 291316.48 471627.52
Total Material Amount (in Rs.): 774592
ROYALTY STATEMENT
Sl.No. Activity Name Quantity (A) Unit
No data to display.
ADDITION COMPONENT
S/N Item Name Amount (in Rs.)
1 Display Citizen Board @ Rs. 1662 Rs. 1662
2 Any Other Lumpsum @ Rs. 8000 Rs. 8000
3 Provision for Contingency @ Rs. 8000 Rs. 8000
Total Addition Component Amount (in Rs.): 17662
DEDUCTION COMPONENT
Sl.No. Item Name Amount (in Rs.)
No data to display.
Total Deduction Component Amount (in Rs.): 0
Total Net Amount (in Rs.): 799999.92