State: Odisha District: Jajpur Block: Dharmasala Gram Panchayat: Arabal
Work Code: OD/356/3397/118328/401322/00022332 (Imp. of Road with CC/ Gr-II Metalling from Kangali Samal House to School Chhak At-Arabal)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Dharmasala Proposal Date: -
Date of Commencement: 30-10-2025 Date of Completion: 19-11-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance and improvement of Road infrastructure
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: MONALISHA NAYAK
Administrative Approval Details
Approval No.: OD/356/3397/118328/401322/00022332/AS
Technical Sanction Details
Technical Sanction No.: OD/356/3397/118328/401322/00022332/TS
Fund Sanction No.: 31142
Fund Sanction Amount (in Rs.): 300000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Skilled Un-Skilled Semi-Skilled
562 462 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 20.435 Cubic Meter 3.9 79.6965 - - 0.18 3.6783
2 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 24.4 Square Meter - - 0.05 1.22 0.05 1.22
3 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 20.435 Cubic Meter 4.6 94.001 - - 0.68 13.8958
Total Qty 18.7941 173.6975 1.22
Rate Per Man Day 562 462 512
Total Amount 10562.2842 80248.245 624.64
Total Labour Amount (in Rs.): 91435.1692