State: Odisha District: Ganjam Block: Khallikote Gram Panchayat: Mathura
Work Code: OD/354/3377/117846/411892/00079385 (Construction of VC Room at Khallikote Block Office)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Khallikote Proposal Date: -
Date of Commencement: 02-02-2026 Date of Completion: -
Scheme Name: Construction of Non Residential Building Scheme Component Name: CONSTRUCTION OF NON-RESIDENTIAL BUILDING
Project Sub-Category: Conference Hall Project Type: New Work
Name of Executant: SYAMALENDU PANDA
Administrative Approval Details
Approval No.: OD/354/3377/117846/411892/00079385/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3377/117846/411892/00079385/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 1000000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Highly-Skilled Semi-Skilled Skilled
462 612 512 562 25
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
2 Other Building Items. (AR1906) : Providing fitting and fixing up partition walling OEL aluminum anodized section No.9210 and 9207 as single groove and double groove - Providing fitting and fixing up partition walling OEL aluminum anodized section No.9210 and 9207 as single groove and double groove respectively as horizontal and vertical member and OEL section 4660 as Tapered clip and jointing angle No.1855 etc. including cost of laminated board as per the Direction of Engineer In Charge 75.7076 Square Meter 3.5714285714286 270.38428571429 - - - - 3.5714285714286 270.38428571429
4 Other Building Items. (AR1910) : Al. door with 6mm glass in top portion and 12mm thick pre-laminated board in bottom - Providing fitting, fixing of Al. door with OEL anodized Al. door section of 9202 as vertical member, 9201 as top member and 9200 as bottom and middle member and 6mm Black glass in top portion with 12mm thick pre-laminated board in bottom portion fixed on door frame by means of tapered clip No.4660 and the frame to be completed by means of jointing angle No. 1855 including all cost of labour, T&P, hire charges of drilling machine, labour charges etc.complete and as per direction of Engineer in Charge 5.07621992 Square Meter 0.82872928176796 4.2068120883978 0.66298342541436 3.3654496707182 0.82872928176796 4.2068120883978 - -
Total Qty 274.59109780268 270.38428571429 3.3654496707182 4.2068120883978 0
Rate Per Man Day 462 612 512 562 25
Total Amount 126861.08718484 165475.18285714 1723.1102314077 2364.2283936796 0
Total Labour Amount (in Rs.): 296423.60866707