State: Odisha District: Kalahandi Block: Jayapatna Gram Panchayat: Pratappur
Work Code: OD/358/3412/118684/424198/00064431 (REPAIR AND RENOVATION OF BIR CHAUNRIA TEMPLE AT AMPARA, PRATAPPUR)
Project Category: Religious Structures
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Jayapatna Proposal Date: -
Date of Commencement: 19-01-2026 Date of Completion: -
Scheme Name: Chief Minister Special Assistant Scheme Component Name: Self/Personal Deposit
Project Sub-Category: Religious Structures Project Type: Repair and Maintenance
Name of Executant: SUSHANTA KUMAR DAS
Administrative Approval Details
Approval No.: OD/358/3412/118684/424198/00064431/AS
Technical Sanction Details
Technical Sanction No.: OD/358/3412/118684/424198/00064431/TS
Fund Sanction No.: 592
Fund Sanction Amount (in Rs.): 500000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM134 BRMMR0027 BRM060 BRM052 BRM084 BRM104 BRM253 BRM140 BRM255 BRM252 BRMM106
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 3.375 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 17.55 Cum 1 17.55 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 21.6 Cum - - 2.29 49.464 0.48 10.368 0.96 20.736 - - - - - - - - - - - - - - - - - - - - - -
4 Flooring (AR0816j) :.Fixing Chequred Tiles in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 - Fixing Chequred Tiles in floor , treads or steps and landing on a 25mm thick bed of cement mortar 1:1 (1cement: 1sand) jointed with neat cement slurry mixed with pigment to match the shades of the Chequred tiles including rubbing and polishing, cost of precast tiles complete as per direction of Enginer-in-charge. 162 Sqm - - 0.2737 44.3394 0.013 2.106 - - 1 162 1 162 - - - - - - - - - - - - - - - - - -
5 R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 2.88 Cum - - 3.4733 10.003104 0.45 1.296 - - - - - - 0.36 1.0368 0.54 1.5552 6.2216 17.918208 0.0502172 0.144625536 - - - - - - - - - -
6 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 414.4 Sqm - - - - - - - - - - - - - - - - - - - - 0.084 34.8096 - - - - - - - -
7 Painting(AR0920) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 314.4 Sqm - - - - - - - - - - - - - - - - - - - - - - 0.125 39.3 - - - - - -
8 Painting(AR0918ca) :.Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 100 Sqm - - - - - - - - - - - - - - - - - - - - - - - - 0.125 12.5 0.084 8.4 - -
9 miscellaneous(ARM106) :.Labour for fitting and fixing of M.S. Gates as per approved design including cost of all materials complete (Iron works) and as directed by Engineer-in-Charge. - Labour for fitting and fixing of M.S. Gates as per approved design including cost of all materials complete (Iron works) and as directed by Engineer-in-Charge. 9.125 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 9.125
Total Qty 17.55 103.806504 13.77 20.736 162 162 1.0368 1.5552 17.918208 0.144625536 34.8096 39.3 12.5 8.4 9.125
Rate Per Unit 465.13 603.476 470.07 1362.4 254.75 8.5 1762.15 1747.15 259.678 58582.598 159.28976 249.59976 189.75976 125.75976 93.32
Total Amount 8163.0315 62644.733807904 6472.8639 28250.7264 41269.5 1377 1826.99712 2717.16768 4652.964417024 8472.5396360225 5544.812829696 9809.270568 2371.997 1056.381984 851.545
Total Material Amount (in Rs.): 185481.53184265